Westerbeke 15.0KW -60Hz EDT Manual do Operador Página 70

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 100
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 69
4-Pole
Generator
Load
120V
(1
240V
(rpm)
Plants Plants
None
1830 62
122 240
(1530)
(52) (112) (224)
Hall 1800
60
120 240
(1500) (50)
(110) (220)
Full
1755
59
110
220
(1455)
(49)
(100)
(200)
The output voltage should be checked periodically
to
ensure proper operation
01
the generating plant and
the
appliances it supplies.
If an AC voltmeter
or
ampmeter is not installed
to
monitor
voltage and load, check it with a portable meter
and amp-probe.
Preventive Maintenance (Generator)
Maintenance on
the
generator is minimal.
1.
Keep. the generator
clean,
dry
and
well-ventilated.
2.
Ensure that all connections are clean and
tight
and that cables carrying AC voltage are properly supported
and protected against chafing.
3.
The rear armature bearing is lubricated and sealed; therefore,
no
maintenance is
,,,,,,,,,e,,.
becomes rough
or
noisy, replace
IT.
Generator Troubleshooting
If the bearing
A complete and illustrated text on troubleshooting the BTG series
of
generators is furnished
in
the Techni-
cal
Manual which is available through
your
local dealer.
Weslerbeke Generators
Vista de página 69
1 2 ... 65 66 67 68 69 70 71 72 73 74 75 ... 99 100

Comentários a estes Manuais

Sem comentários